ENCN

Home / How long will it takes to Produce and Install a Tension Fabric Structure?

Back

How long will it takes to Produce and Install a Tension Fabric Structure?

FAQ 2023-7-13

It will takes 7-25 days for production and 2-5 days for installation

Back

How long will it takes to Produce and Install a Tension Fabric Structure?

Recent News

  • What is an ETFE membrane structure air pillow?

  • Air-membrane structure | “Zibo Pearl”

  • Application of ETFE film

  • Steel structure | The overall lifting of the steel structure of the Xiong’an Stadium roof was successful

WhatsApp

+852 69447081

Message Email

yexing01@yexingms.com

Top

Leave us a Message