Management of materials on the construction site of membrane structure

News 2023-7-11

Whether the management of materials at the membrane structure construction site is appropriate is related to the smooth progress of the membrane structure construction, and the construction site material management should be as follows:

1) The project manager department is responsible for loading and unloading engineering materials, tools and equipment that arrive at the site and moving them to a safe storage site. Beware of damage, confusion, loss and pollution when handling, clearly marked in the stacking place, and inspected, inspected and registered by the sending and receiving personnel. Develop a removal plan if necessary and follow it.

2) The handling of membrane unit packaging should use suitable and reliable handling tools, and it is strictly forbidden to drag on hard ground to prevent the membrane unit from being damaged during handling. The on-site storage of membrane unit packaging should be selected in a clean, dry and safe warehouse or site storage, and should be carried out in strict accordance with the relevant requirements of the membrane structure installation site and the regulations on storage outside the membrane material warehouse, and the membrane material should be strictly avoided from being contaminated or damaged.

3) Large-volume materials such as steel components and large steel cables can be stored in the designated storage site when they arrive at the site, and attention should be paid to the protection of finished products (such as the ground) that have been completed on the site when handling, and pay attention to the safety of operators.

4) Smaller or scattered items such as small steel cables, tarsal parts, and tools and equipment should be stored in a temporary warehouse with closed measures provided by the construction unit.

5) The installation project manager department should do a good job in waterproof, fireproof, anti-theft, anti-pollution and other safety protection work, and should take specific safety and security measures to protect the engineering materials, tools and equipment stored on site (whether indoor or outdoor).

6) The installation project manager department shall clearly mark all materials and materials stored on site, and store them in different regions and levels according to the installation order.

Back

Recent News

  • The PTFE membrane structure project of Yexing Chongzuo Sports Center has entered the final stage

  • New News丨Xi’an International Football Center

  • Application of membrane structure in real estate projects

  • Factors affecting the price of sewage pool membrane capping

WhatsApp

+852 69447081

Message Email

yexing@yexinggroup.com

Top

Leave us a Message