Director of Yexing
Membrane Structure Design
ENCN
ENCN
Home / Projects / Brunei Parque Cristal landscape membrane Structural engineering
Project name: Yexing Brunei Parque Cristal Landscape Film Structural engineering
Project location: Brunei Parque Cristal
Project area: 1300 square meters
Engineering structure: tension type, skeleton structure, spatial cable membrane structure
Engineering steel: high-frequency welded pipe and seamless welded pipe, with a service life of 50 years
Engineering membrane material: Germany imported Seidler PVDF environmental protection series construction membrane, Saint-Gobain ptfe membrane material warranty for 15 years
Project duration: Design production installation integrated, total working hours 57 days
The PTFE canopy membrane structure and PVC membrane structure project of Brunei Parque Cristal has designed a series of classic membrane structure landscape canopies according to local conditions for various scenes in the park, including the membrane structure at the entrance of two teams, a wooden wharf membrane structure, a railway station membrane structure, main entrance and exit membrane structure, etc.
Brunei Parque Cristal landscape membrane Structural engineering
Date | 2017 |
---|---|
Location | Brunei Parque Cristal |
Size | 1,300 m² |
Membrane | PVDF&PTFE |
Structure | tension type, skeleton structure, spatial cable membrane structure |
The steel structure of the Yexing project has been carefully constructed and installed by force analysis and structural calculation by STAAD, SW, ANSYS, RHINO, 3D3S and other software, and has become a permanent building structure with a life of at least 50 years.
Yexing has 19 years of professional installation experience in steel structure and 15 years of membrane structure, and more than 400+ landing projects at home and abroad are the greatest affirmation of Yexing's construction level.
Imported top brand membrane material, with high tensile strength, large bearing capacity, long service life, bearing capacity per square can reach 300-500KG, wind resistance level 12 or more, upper, seismic resistance above 7 grade.
Yexing adopts imported intersecting wire cutting equipment and first-stream carbon dioxide protection welding equipment, which has good precision, high efficiency, and electric welder certificate. On-the-job, strict assessment, outstanding craftsmanship.
The anti-corrosion and anti-rust process of Yexing film structure is controlled layer by layer through 8 processes: shot blasting, rust removal, sandblasting, 2 primers, intermediate paints and 2 topcoats, and strictly abide by the quality.
Yexing membrane structure accessories are high-quality, all stainless steel or national standard hot-dip galvanized customized standard parts, PE cables are provided by Juli Group, high vanadium cables are provided by Jianlang Group.