ETFE membrane structure of Guangzhou Hongcheng Plaza

Guangzhou Hongcheng Plaza ETEF membrane structure, also known as “Tianhuan”, is located in the core area of Guangzhou’s new CBD. The whole project covers an area of 110000 square meters, which is a complex integrating retail, traffic oriented development and public greening design. 9800 square meters of double carp “fish scale” all adopt single-layer ETFE membrane structure, which has environmental protection functions such as rainwater collection and natural light transmission, creating a green landscape structure with ups and downs.

Project images

Project Overview

Date 2016
Location Guangdong, China
Size 9,800 m²
Membrane Transparent ETFE + plating point
Structure Single layer ETFE membrane structure

Expert Contact

Mr.Weigang Wang

Director of Yexing
Membrane Structure Design

yexing@yexinggroup.com

Featured Products

ETFE

ETFE film: high light transmittance, excellent toughness, weather resistance, self-cleaning, and easy installation. Ideal for stadiums, tourist venues, and more.

View Details

Quick Links

Back

The construction is fine and experienced

The steel structure of the Yexing project has been carefully constructed and installed by force analysis and structural calculation by STAAD, SW, ANSYS, RHINO, 3D3S and other software, and has become a permanent building structure with a life of at least 50 years.

Permanent structure, stable as a mountain

Yexing has 19 years of professional installation experience in steel structure and 15 years of membrane structure, and more than 400+ landing projects at home and abroad are the greatest affirmation of Yexing's construction level.

Imported membrane material, wind and earthquake resistance

Imported top brand membrane material, with high tensile strength, large bearing capacity, long service life, bearing capacity per square can reach 300-500KG, wind resistance level 12 or more, upper, seismic resistance above 7 grade.

Advanced equipment, precision welding

Yexing adopts imported intersecting wire cutting equipment and first-stream carbon dioxide protection welding equipment, which has good precision, high efficiency, and electric welder certificate. On-the-job, strict assessment, outstanding craftsmanship.

8 processes, anti-corrosion and anti-rust

The anti-corrosion and anti-rust process of Yexing film structure is controlled layer by layer through 8 processes: shot blasting, rust removal, sandblasting, 2 primers, intermediate paints and 2 topcoats, and strictly abide by the quality.

High-quality accessories, quality assurance

Yexing membrane structure accessories are high-quality, all stainless steel or national standard hot-dip galvanized customized standard parts, PE cables are provided by Juli Group, high vanadium cables are provided by Jianlang Group.

WhatsApp

+852 69447081

Message Email

yexing01@yexingms.com

Top

Leave us a Message