This project is the first domestic landscape canopy building perfectly inlaid with single-layer ETFE and double-layer air pillow film. With the high light transmittance and self-cleaning property of ETFE film and the heat insulation ability of double-layer air pillow, the canopy can achieve natural lighting while having the function of sun shading and rain blocking, and pedestrians do not have the bondage of traditional sealed buildings; On the other hand, ETFE membrane structure building is one of the latest architectural application forms in the contemporary era. The project is highly customized, high in appearance, unique, and has its own aura of gathering popularity.
Hangzhou Yintai Plaza ETFE membrane structure landscape canopy project
Date | 2019 |
---|---|
Location | Zhejiang, China |
Size | 2,585 m² |
Membrane | Transparent ETFE + plating point |
Structure | Single layer ETFE + double layer air cushion membrane |
ETFE film: high light transmittance, excellent toughness, weather resistance, self-cleaning, and easy installation. Ideal for stadiums, tourist venues, and more.
View DetailsThe steel structure of the Yexing project has been carefully constructed and installed by force analysis and structural calculation by STAAD, SW, ANSYS, RHINO, 3D3S and other software, and has become a permanent building structure with a life of at least 50 years.
Yexing has 19 years of professional installation experience in steel structure and 15 years of membrane structure, and more than 400+ landing projects at home and abroad are the greatest affirmation of Yexing's construction level.
Imported top brand membrane material, with high tensile strength, large bearing capacity, long service life, bearing capacity per square can reach 300-500KG, wind resistance level 12 or more, upper, seismic resistance above 7 grade.
Yexing adopts imported intersecting wire cutting equipment and first-stream carbon dioxide protection welding equipment, which has good precision, high efficiency, and electric welder certificate. On-the-job, strict assessment, outstanding craftsmanship.
The anti-corrosion and anti-rust process of Yexing film structure is controlled layer by layer through 8 processes: shot blasting, rust removal, sandblasting, 2 primers, intermediate paints and 2 topcoats, and strictly abide by the quality.
Yexing membrane structure accessories are high-quality, all stainless steel or national standard hot-dip galvanized customized standard parts, PE cables are provided by Juli Group, high vanadium cables are provided by Jianlang Group.