The membrane structure of Tongzi Kaiyuan Fangcaoping Village Moon Field is a project contracted by Yexing Membrane Structure Co., Ltd. from design, construction, materials and other one-stop services. According to the owner’s requirements, after the project is completed, it will serve as the opening and closing venue for large-scale activities at specific times, and will operate as a commercial and leisure square in normal times. The project is landing on the hillside of a resort area. We consider safety, beauty, practicality and other aspects, and it is designed as a comprehensive membrane Structural engineering with both tourist landscape and commercial functions. The project has now been completed and put into operation, with a more beautiful appearance than expected, adding a touch of brightness to the resort area.

Project images

Tongzi Kaiyuan Fangcao Village Moon Field Membrane Structural engineering

Project Overview

Date 2019
Location Guizhou, China
Size 2,850 m²
Membrane White PVDF film
Structure Solar membrane structure

Expert Contact

Mr.Weigang Wang

Director of Yexing
Membrane Structure Design

yexing@yexinggroup.com

Featured Products

Quick Links

Back

The construction is fine and experienced

The steel structure of the Yexing project has been carefully constructed and installed by force analysis and structural calculation by STAAD, SW, ANSYS, RHINO, 3D3S and other software, and has become a permanent building structure with a life of at least 50 years.

Permanent structure, stable as a mountain

Yexing has 19 years of professional installation experience in steel structure and 15 years of membrane structure, and more than 400+ landing projects at home and abroad are the greatest affirmation of Yexing's construction level.

Imported membrane material, wind and earthquake resistance

Imported top brand membrane material, with high tensile strength, large bearing capacity, long service life, bearing capacity per square can reach 300-500KG, wind resistance level 12 or more, upper, seismic resistance above 7 grade.

Advanced equipment, precision welding

Yexing adopts imported intersecting wire cutting equipment and first-stream carbon dioxide protection welding equipment, which has good precision, high efficiency, and electric welder certificate. On-the-job, strict assessment, outstanding craftsmanship.

8 processes, anti-corrosion and anti-rust

The anti-corrosion and anti-rust process of Yexing film structure is controlled layer by layer through 8 processes: shot blasting, rust removal, sandblasting, 2 primers, intermediate paints and 2 topcoats, and strictly abide by the quality.

High-quality accessories, quality assurance

Yexing membrane structure accessories are high-quality, all stainless steel or national standard hot-dip galvanized customized standard parts, PE cables are provided by Juli Group, high vanadium cables are provided by Jianlang Group.